Demoulding

The elements are removed from the forms between 16 and 20 hours after pouring. This is when the concrete has a compression strength of at least 15 N/mm². We have drying tunnels or individually heated stands in our halls to accelerate the curing time.

Let's connect, follow us on

©2019 LOVELD | All rights reserved | Privacy policy | Disclaimer | VAT BE 0445.434.193